Gtc Greatcooler Electronic Technology Co., Ltd.
Home > Products > Cooling Fans > Greatcooler GTC-A4510 DC Fan

Greatcooler GTC-A4510 DC Fan

—Blade Material: Plastic, GTC Cooling Fan, Greatcooler DC Fan, Cooling Fan
Product Category: Cooling Fans
Sales Method: Manufacture
Payment Term: T/T, L/C
Min. Order Unit Price
1000 Pieces USD 3 / Piece
1000 Pieces USD 3 / Piece
Contact Info

Miss.Ariel

Address: China (mainland) Guangdong Dongguan,Wentang Guangchang Road, Dongcheng District, Dongguan City, Guangdong, Province, China

Product Detail

Product Attribute:

  • China (mainland) More >
  • GTC-A4510 DC Fan
  • greatcooler
  • Blade Material: Plastic
  • CE, ISO
  • 06/15/2017
  • 06/15/2017

Additional Info.:

  • yes
  • yes
  • 600000 Pieces / month
  • within 21 Days
  • shenzhen
  • standard package

Product Content Description:

Specifications:
 
Size: 45*45*10mm
Voltage:DC 5V/12V
Speed Type :H/M/L
current: 0.12A/0.22A
Fan Speed:4000RPM-6000RPM
Air Flow :5.96-8.67CFM
bearing type: Sleeve bearing/One ball bearing/2-ball bearing
Noise :20-28dBA
Connector:2Pin+3Pin
Certification:CE , ISO
Type: greatcooler GTC-A4510 DC Fan
Electric Current Type:DC
Mounting:cooling fan
Blade Material:Plastic
 
Place of Origin:China (Mainland)
Brand Name:greatcooler
Model Number: GTC-A4510 DC Fan
 
 
Shippment:
 
1.FOB Shenzhen or HongKong for mass production.
2.DHL,UPS,FEDEX,TNT or any other international express for sample or small quantity.
Anyway,the more details can be discussed.
 
 
Payment:
 
1.We can accept the Payment T/T and L/C.
 
2.The payment for the high value sample will be charged, and will be returned to youafter confirming the mass production.
 
3.The payment for the low value sample is free, but the freight should be covered by you.
 
Packaging & Delivery
Packaging Details:standard package
 
Shipping:
 
1.The sample will be shipped by express, like FEDEX, DHL, UPS and EMS. And the freight should be paid by clients.
 
2.The mass goods will be shipped by air for any emergency, the freight will deal with you for the concrete condition.
 
3.Usually, the products will be shipped by sea.
 
 
Delivery Time:
3 weeks after confirming all informations. 
 
Primary Competitive Advantages:
Product Features
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Experienced Staff
Packaging
Price
Main Export Markets:
Asia
Australasia
Central/South America
Eastern Europe
Mid East/Africa
North America
Western Europe
Payment Details:
Payment Method:T/T , paypal
Delivery Details:
FOB Port:Shenzhen
Lead Time:15 - 21 days
 

Send your inquiry to this supplier

- Your message must be between 20-3000 characters.

Browse

- jpg, jpeg, gif, txt, doc, pdf, xls, docx,xlsx, rar or zip format;
- Max. size of 2MB